HomeServicesSuccess StoriesAboutInsightsCareersContactRequest talent
Success stories

Work measured in outcomes.

Engagements across staffing, IT delivery, ERP and applied AI — each scoped against a number agreed before we started: time to fill, go-live date, backlog size, run cost. Client names withheld; references available on request.

0
Professionals placed with clients
0
Enterprise clients across six industries
0
ERP implementations and rescues delivered
0
Placements still in seat past twelve months
Browse the work

Filter by service.

StaffingBFSI
18 in 4 wks
Senior engineers onboarded to a stalled program

Emergency engineering scale-up for a banking platform

A core modernization program lost its vendor mid-flight with a regulatory date fixed. We staffed eighteen senior Java, QA and DevOps engineers from our bench inside a month — every one still on the program a year later.

Java · AWS · ContractRequest detail
SAP S/4HANAManufacturing
On date
Go-live held after two earlier slips

Rescuing a stalled S/4HANA migration

Two missed go-live dates, a fatigued core team and eroding executive confidence. We re-planned the cutover around business-critical periods, staffed the FICO, MM and ABAP gaps with senior consultants and ran the final mile. Hypercare closed in six weeks.

S/4HANA · Data migration · CutoverRequest detail
AI & AutomationShared Services
72%
Of L1 tickets triaged automatically at stable CSAT

AI ticket triage inside an ERP support desk

An AMS desk drowning in password resets and repeat incidents. We added an AI triage layer that classifies, routes and drafts responses, with engineers approving before anything ships. Backlog cleared in a quarter.

LLM · ServiceNow · AMSRequest detail
ERP StaffingEnergy
9 modules
Staffed with functional consultants in three weeks

Full functional bench for an Oracle Fusion rollout

A utility moving from EBS to Fusion needed Financials, Procurement and HCM consultants simultaneously — a profile the local market couldn't supply. Our bench covered all nine module needs, blended onshore and offshore.

Oracle Fusion · Blended deliveryRequest detail
Managed PodRetail
2× / yr → 26×
Release cadence after modernization

Managed delivery pod for an e-commerce re-platform

A retail group's monolith could only ship twice a year. Our pod — architect, six engineers, QA and a delivery lead — re-platformed it to microservices on Azure with CI/CD, moving them to fortnightly releases.

.NET · Azure · KubernetesRequest detail
AI RecruitingTechnology
21 → 4 days
Time from requisition to first interview

AI-assisted screening for a high-volume TA team

We deployed our screening stack inside a client's own talent team — resume parsing, skill matching, ranked shortlists — with recruiters making every final call. Interview-to-offer conversion improved alongside speed.

LLM · ATS integrationRequest detail
Dynamics 365Distribution
14 sites
Rolled out on a single template, one per month

Multi-site Dynamics 365 F&O rollout

A distribution business acquired faster than its systems could absorb. We built a rollout template — data, training, cutover runbook — and repeated it across fourteen sites without disrupting shipping operations.

D365 F&O · Power PlatformRequest detail
AMSConsumer Goods
-64%
Open ticket backlog in six months

Oracle AMS desk turnaround

Two years of accumulating backlog under the previous vendor. We rebuilt the desk around problem management instead of ticket-closing — with AI-matched known errors — and cleared the queue with a smaller team.

Oracle EBS · ITIL · AI triageRequest detail
Data & AnalyticsManufacturing
1 version
Of revenue, margin and stock across the group

Group reporting layer over three ERPs

Three acquisitions, three ERPs, three definitions of margin. We built a warehouse and semantic layer that reconciles them into one governed model — month-end reporting went from nine days to two.

Snowflake · dbt · Power BIRequest detail

Detailed write-ups and reference calls are available on request during evaluation.

How we report

The number is agreed before we start.

Staffing and consulting are easy to fake with activity — CVs sent, hours billed, tickets closed. We avoid that by agreeing one primary metric and a baseline in week one, then reporting against it whether it flatters us or not.

  • StaffingTime to shortlist, interview-to-offer ratio, and retention at 6 and 12 months.
  • ERP & deliveryMilestone dates held, defect escape rate, and backlog trend after go-live.
  • AI & automationHours returned, straight-through rate, and payback against the original business case.
Outcome measurement illustration
Your turn

Which of these looks like your problem?

Tell us the role, the system or the backlog. We'll respond within one business day with a concrete approach.